PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavating for the underground sanitary sewer Facing East (800x600).jpg Installing metal decking at Steel arch Facing East (800x600).jpg Started installing the temporary stair Facing South (800x600).jpg Underground storm piping between column lines G-G.1 Facing North (800x600).jpg Gravel for Stair -5 pit Facing North (800x600).jpg Installed metal decking at Steel arch Facing East (800x600).jpg Placing 3-4 gravel insde Stair -5 pit Facing West (800x600).jpg Started installing rebar mats at Elev. 1,2,3 (3rd Floor) Facing South-West (800x600).jpg Started installing the shear wall panels at Elev. 5,6 (3rd Floor) Facing East (800x600).jpg
Previous pageNext page Gravel for Stair -5 pit Facing North (800x600)
Gravel for Stair -5 pit Facing North (800x600)